SPECIFICATIONS | ||||
Sl.No | CHOICE | COMPACT | GRAND | LUXURY |
Category | Built-up area below 1200 sft | Built-up area from 1200 sft | Built-up area above 2000 sft | |
Rate | Rs 1999/- per Sq.ft | Rs 2399/- per sq.ft | Rs 2699/- per sq.ft | |
01 | Foundation | Column Footing (9" X 9" column) | Column Footing ( as per design) | Column Footing |
02 | Structure | Framed structure | Framed Structure | Framed Structure (Earth quake resistant) |
Cement | Birla,Penna,Zuari or equal brand | Coromandel for RCC &Maha,Penna for other works | Ultratech,Coromondel,Ramco | |
Sand | M.Sand double wash | M.Sand double wash | M.Sand double wash / river sand for plaster | |
Steel | GBR,Viki TMT bars | ARS TMT bars | TATA Tiscon or equalant | |
03 | Super Structure | 9" Outer wall-Chamber Brick | 9" Outer wall- Brick (Box) or AAC block | 8" Prorotherm Block /Aerocon |
Cut lintel for doors & windows | Cut lintel for doors & windows | Thro' lintel for doors & windows | ||
04 | Joineries | T.W door frame with OST-3'6" | Solid T.W door-3'6" ft width ,3" x 5" frames | Solid Teakwood door -4' width or steel door |
a) | Main door | T.W door frame with OST-3'6" | Solid T.W door-3'6" ft width ,3" x 5" frames | Solid Teakwood door -4' width or steel door |
b) | Bedroom door | Flush Door with C.W frame-3'0" | Membrane Door with C.W frame-3'0" | Laminated Door with T.W frame-3'0" |
c) | Bathroom door | Panelled PVC door-2'6" | Solid PVC door -2'6" | WPC laminated door - 2'6" |
d) | Windows | Aluminium powder coated - | UPVC or C.W frame | African T.W frame & shutters or UPVC open |
Each room one window- 4' X 4' | Window max size. 4' X 4' | Window max size. 5' X 4'6" | ||
Kitchen one window -3' X 3',V-2'x2' | Kitchen one window -3' X 3',V-2'x2' | Kitchen one window -3' X 4',V-2'x2'6" | ||
e) | Fittings | SS powder coated | SS Fittings | Brass Fittings |
f) | Grills & Handrails | M.S Handrails & Grill with | M.S Handrails & Grill with step tiles | SS for staircase handrails with granite |
enamel paint | enamel paint | and MS grills for windows | ||
05 | Flooring | Nano tiles 2'X 2' | Vitrified digital tile-2' x 2' | Digital tiles -4' x2' |
Basic cost Rs 32/- per Sq.ft | Basic Cost Rs 40 persq.ft | Basic cost Rs 55 per sq.ft | ||
06 | WARDROBE | Open wardrobe with | Open wardrobe with | Open wardrobe |
cuddappah slab | cuddappah slab | |||
07 | Kitchen | Black Granite top with 2ft (8" x12") | Black Granite top with 2ft height tiles (12x18) | Premium Granite top with tiles upto window |
height | (branded) | height (12" x 24") | ||
08 | Bathroom Tile | Upto 5' ht (10" x 15") | Upto 7' ht (12" x 18") | Upto roof 12" X 18" |
Basic cost Rs 24/- per Sq.ft | Basic cost Rs 32/- per Sq.ft | Basic cost Rs 40/- per Sq.ft | ||
09 | Electrical | Normal switches with minimum | GM switches (white) | Anchor Roma or GM (white) |
points | Finolex or orbit | Finolex or orbit | ||
10 | Plumbing | 2 Taps for hot & cold | 2 in 1 wall mixture, shower | 3 in 1 wall mixture,EWC with slim tank (white) |
1 Indian closet & 1 WC for bath | Western closet regular with slim tank | All taps & fittings | ||
1 common wash basin | (Hindware or Parryware) | (Parryware) | ||
11 | Painting | Emulsion without patty for all walls | Emulsion with patty finish | Emulsion with patty finish |
for all inner walls except stair | for inner walls & front elevation | |||
Varnish for OST door side | Varnish for main door | Varnish for main door & other | ||
Enamel paint for other joineries | joineries |
Above rates are subject to change with the prevailing market rates of labour & material
Note:
a) Foundation size & design may vary acording to soil test. Any special type foundation apart from column footing shall be charged extra.
b) Concrete and Brick work shall be done with M.Sand. For river sand additional charges are applicable.
c) Terrace work with cooling tiles is excluded on the above rates and shall be charged extra.
d) Sump,OHT,Septic tank shall be charged extra.
e) All around set back area / side ways flooring shall be charged extra.
f) Soil Test, Water test,Drawing fees for Architect & Structural shall be charged extra.